Summary
A goods manufacturing practice (GMP), needed someone to source and implement a small capital expense project. They were unable to identify anyone internally with the available time or skills to assist. FootBridge stepped in and identified John as a great fit for their project. John secured the required materials faster than expected with deep cost savings recognized by our client.
Project Scope
A goods manufacturing practice (GMP) with multiple small capital expense projects needed a production process improvement/optimization that would involve a demo and rebuilding of a GMP facility.
FootBridge hired John, a construction manager (CM), to work on front-end specifications, third-party designs, and material selections. John also:
Problem
Supply chain issues are an ongoing concern for current construction projects. COVID-19 lockdowns and job insecurities abruptly stopped the shipment of global goods, and even though the nation is starting to recover, delays are still prominent. In this case, the lead time for insulated metal panels (IMPs) was eight months, and there were issues with stainless curbs due to sourcing steel and fabrication disruptions.
What’s more, the existing insulated metal panels (IMP) were a cam lock design, and the client wasn’t sure how they would fit in the current ceiling design. Despite the summer heat and tight attic space, John helped our client create detailed structural attachments, much to the client’s surprise.
The Outcome
FootBridge was able to locate and qualify the ideal candidate to assist our client in a short turnaround window. Thus putting John in a position to identify vendors who could meet stainless specifications with same-year delivery while also identifying a provider who could supply, source, and turn out fabrication ahead of schedule. Pricing, including fabrication, was only about 50% above sourcing the steel sheets alone ($40K to buy steel with no firm commitment on full delivery, $60k all in delivered fabrication to the site).